Perfect Bases for

all Garden Buildings


Email: shedbases@btinternet.com

Call our team on 01490 413178

Leave a message if we are

 busy, we will call you back

 

Plas yn Bonwm

Holyhead Rd

Corwen

LL21 9EG



  Free Nationwide Delivery

Main

Menu

3 1 2

Place the timbers and feet in their correct positions and mark the area under the feet where the feet will stand

Remove the base and dig a hole 440 x 210mm by 100mm deep, one for each foot. Place the concrete blocks into the holes.

Place the feet, one foot in the middle of each block and rest the timbers into the brackets.

Drill and bolt each foot to the timbers A & B

Add additional timbers using our SBS-H brackets C

Adjust the height of each foot using the top nuts

until all timbers are level. Tighten bottom nut

against top nut to prevent movement ( D )



Once the base is completely level fix the floor to the base timbers and erect the building. Bolt foot to block ( E ) if

desired

5 4

A

B

Supplied with screws

H bracket sets

D

C

E

Fast  Free Emailed  Quotation   -   Click here